Le Plateau Wind Farm

Construction LFG was mandated to carry out construction of the BOP works and the erection of 60 wind turbines of 2.3 MW each for a wind farm with capacity of 138.6 megawatts.

The construction includes 75 km of access roads, a 75 km collector network and a substation to integrate production with the Hydro-Québec network.

The wind farm can serve up to 45,000 homes and is connected to a Hydro-Québec 315 kV transmission line.