Anse-à-Valleau Wind Farm

Cartier Énergie Éolienne mandated LFG Construction to erect a farm of 67 winds turbines with a capacity of 1,5 megawatts each designed by GE.

LFG was also responsible for design and construction of the road infrastructure required for the project. It was the same for the complete electrical connection of the wind turbines, from inside the towers to the substation, through a 35 km long underground system.

Because of its expertise and efficient management of the various teams required for such a project LFG delivered to Cartier Energie Eolienne a wind farm with a total output of 100 megawatts within the schedule and budget.